Asphalt Works for TS-2 CHINA HARBOUR
For the TS-2 CHINA HARBOUR project, we undertook asphalt concrete work involving the application of 109,761.67 square meters (m²) of Asphalt Concrete Surface Course with a thickness of 70mm. Additionally, we laid 109,761.67 square meters (m²) of Asphalt Concrete Base Course with a thickness of 180mm, which included the application of MC1 and two applications of RC2. Achieving a high level of compaction, ideally 98% of the Theoretical Maximum Density (TMD), is essential for the structural integrity and longevity of these asphalt layers. All work was performed in accordance with the project specifications and quality control standards.